All residential projects with Rebate Reservation Form's submitted after March 3rd, 2020 will be required to be enrolled in the following rate schedules based on their rebate qualifier prior to the final incentive claim form being submitted.
PG&E
Standard & Equity Resiliency Rebates ( Qualifiers: Well pump, High Fire zone, Medical Baseline )
Residential SGIP Rates
- EV-A (Available to all SGIP Customers)
- EV-B (Available to all SGIP Customers)
- EV2-A (Available to all SGIP Customers)
- E6 (Available to all SGIP Customers)
- E-ELEC (Available to all SGIP Customers)
- EM-TOU (Available to all SGIP Customers)
- OPTION S (Available to all SGIP Customers)
- A-1-STORE (Available to all SGIP Customers)
- ETOU-C (Available for Medical Baseline Only)
SMUD
- Time of Day (5-8 p.m.)
ALAMEDA
- EV-TOU
SCE
Standard & Equity Resiliency Rebates ( Qualifiers: Well pump, High Fire zone, Medical Baseline )
Residential SGIP Rates
- Residential TOU-D-PRIME - TOU-D-PRIME Rate Details
- TOU-D-5-8 ( Only available to customers enrolled in a Medical Baseline Program with SCE )
- TOU-EV-1 Residential - (TOU-EV-1 is no longer open to customer enrollment. Customers grandfathered into this rate are eligible).
- TOU-GS-1
- Option E
SoCalGas
LADWP - (main utility)
- There are currently no approved rates specified.
SDG&E
Standard & Equity Resiliency Rebates (qualifiers: Well pump, High Fire zone)
Residential SGIP Rates
- DR SES
- DR-SES (CARE)
- EV-TOU
- EV-TOU-2
- EV-TOU-2 CARE
- EV-TOU-5
- EV-TOU-5 CARE
- EV-TOU-5-P (2)
- EV-TOU-5-P (2) CARE
- TOU-DR1
- TOU-DR1 (w/ baseline adjustment credit)
- TOU-DR1 CARE
- TOU-DR1 CARE (w/ BAC)
- TOU-DR2
- TOU-DR2-CARE
- TOU-DR2-CARE (w/BAC)
- TOU-DR2 (w/BAC)
- TOU-DR-P (1) (w/BAC)
- TOU-DR-P (1) CARE (w/BAC)
- TOU-ELEC
- TOU-ELEC – CARE
Medical Baseline Rebate (qualifier: medical equipment)
- DR-SES (CARE MB)
- DR-SES (MB)
- EV-TOU-2 CARE MB
- EV-TOU-2 MB
- EV-TOU-5 CARE MB
- EV-TOU-5 MB
- EV-TOU-5-P (2) CARE MB
- EV-TOU-5-P (2) Medical Baseline
- TOU-DR1-CARE-MB (Medical Baseline)
- TOU-DR1-CARE-MB (w/ BAC)
- TOU-DR1-MB (w/BAC)
- TOU-DR2-CARE-MB (Medical Baseline)
- TOU-DR2-CARE-MB (w/BAC)
- TOU-DR2-MB (Medical Baseline)
- TOU-DR2-MB (w/BAC)
- TOU-DR-CARE MB (w/BAC)
- TOU-DR-MB (w/BAC)
- TOU-DR-P (1) CARE MB
- TOU-DR-P (1) CARE MB (w/BAC)
- TOU-DR-P (1) Medical Baseline
- TOU-DR-P (1) Medical Baseline (w/BAC)
- TOU-ELEC – MB
If your rate does not appear on the ‘SGIP-Eligible’ rate list; however qualifies as a residential time-varying rate with a peak period starting at 4 pm or later and with a summer peak to off-peak or peak to super off-peak price differential of 1.69 or more, please contact the respective Program Administrator
Residential Projects Without Access to Approved TOU Rates: Customers that do not have access to an approved TOU rate may submit documentation as part of the incentive claim package that demonstrates the system is compliant with either solar-only charging (defined as a battery that begins charging at dawn and continues charging from the solar unit until fully charged, and that never charges from the grid) or has set relevant storage parameters to the appropriate manufacturer-certified functionalities at the time of installation to enable solar-self-consumption mode (defined as systems charging from solar generation and discharging the stored power only to meet onsite load).